{"id":732,"date":"2016-09-15T22:55:09","date_gmt":"2016-09-15T22:55:09","guid":{"rendered":"http:\/\/www.bvecornwall.co.uk\/wordpress\/?p=732"},"modified":"2016-09-16T13:26:20","modified_gmt":"2016-09-16T13:26:20","slug":"the-plymouth-route-v1-7-0-0","status":"publish","type":"post","link":"http:\/\/www.bvecornwall.co.uk\/wordpress\/the-plymouth-route-v1-7-0-0\/","title":{"rendered":"The Plymouth Route V1.7.0.0"},"content":{"rendered":"<p>As usual, rather later than planned, I&#8217;ve released V1.7.0.0 of the Plymouth Route.<br \/>\nChanges are as follows:<\/p>\n<ul>\n<li>Trackwork rebuilt between Menheniot and Liskeard.<\/li>\n<li>GWR 16xx Class Pannier Tank added to the passing train objects.<\/li>\n<li>BR Class 50 added to the passing train objects.<\/li>\n<li>Minor improvements to the three tunnels on the route [Entrance object, wall profile]<\/li>\n<li>Large numbers of assorted objects rebuilt from scratch, with the majority of items in the route now being public domain.<\/li>\n<li>A considerable amount of work has been done on Plymouth station, in order to bring it closer to the standards of the rest of the route.<\/li>\n<\/ul>\n<p>Please note that this route is now supplied as an openBVE packaged ZIP. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>As usual, rather later than planned, I&#8217;ve released V1.7.0.0 of the Plymouth Route.<br \/> Changes are as follows:<\/p>\n<li>Trackwork rebuilt between Menheniot and Liskeard.<\/li>\n<li>GWR 16xx Class Pannier Tank added to the passing train objects.<\/li>\n<li>BR Class 50 added to the passing train objects.<\/li>\n<li>Minor improvements to the three tunnels on the route [Entrance object, wall profile]<\/li>\n<li>Large numbers of assorted objects rebuilt from scratch, with the majority of items in the route now being public domain.<\/li>\n<li>A considerable amount of work has been done on Plymouth station, in order  [&#8230;]<br \/><a href=\"http:\/\/www.bvecornwall.co.uk\/wordpress\/the-plymouth-route-v1-7-0-0\/\">&raquo; Continue Reading.<\/a><br \/>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,5],"tags":[],"class_list":["post-732","post","type-post","status-publish","format-standard","hentry","category-news-updates","category-plymouth-route"],"_links":{"self":[{"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/comments?post=732"}],"version-history":[{"count":1,"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/732\/revisions"}],"predecessor-version":[{"id":733,"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/732\/revisions\/733"}],"wp:attachment":[{"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/media?parent=732"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/categories?post=732"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.bvecornwall.co.uk\/wordpress\/wp-json\/wp\/v2\/tags?post=732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}